Tuesday, September 16, 2008

The Correct Answer is......

The correct answer to the poll question - When deploying the "Finish Load" inside a multi-story dwelling, placement of the "Y" should be where?

On the fire floor.

With the finish load, it is designed to be taken to the fire floor and if the fire is too advanced to use the 1 3/4" line, you disconnect the "Y" and have the 2 1/2" line. Once the fire is knocked down, you can turn off the nozzle of the 2 1/2" line and reconnect the "Y" and utilize the 1 3/4" line.

1 comment:

I Wish I Were A Brady Kid said...

I was right! I did learn something from Pleasant Hill FD!